2024/4/20 23:44:24
SEARCH:     
     Case   Current:Home  ->  Case  ->  Hydraulic and Hydro-Power Engineering
      Project Name:East River Shenzhen Water Supply Improvement Proje
  •   Construction sites:
  •   Scale:the total length is 492.2m. Installed capacity of
  •   Supervision of:
  •   Owner:East River Shenzhen Water Supply Improvement Proje
  •   Project Profile: